AH-64D PPC PDF

The Flight Performance Models (FPMs) embedded in the PPC application are based on flight test data and the performance charts in the AHD Operator’s. This manual provides specific guidelines for executing AHD aircrew Performance planning card (PPC) DA Form R (UH/AH Get the da form 64 r. Description of ah 64d ppc pdf. DEPARTURE PA FAT LOAD TAKEOFF GWT lb SINGLE ENG DUAL ENG FUEL MSN ATF ETF TR MAX .

Author: Shakarn Fenrigul
Country: Nigeria
Language: English (Spanish)
Genre: Environment
Published (Last): 16 January 2009
Pages: 482
PDF File Size: 17.39 Mb
ePub File Size: 6.21 Mb
ISBN: 561-3-27931-597-2
Downloads: 54573
Price: Free* [*Free Regsitration Required]
Uploader: Shakalabar

AH-64D Apache (Longbow)

Within three weeks of our arrival, our missions started taking us to higher and higher ah–64d. On a daily basis, we had power available to hover ah6-4d of ground effect OGE. Our first mission took us from Kandahar to Bagram Airbase to refuel and then on to the eastern city of Khowst. During the winter months at Kandahar, our aircraft performed well.

  LES BASSINS SEDIMENTAIRES PDF

While en route to Khowst, we crossed a snow-covered mountain at 11, MSL.

AH Operations In Afghanistan

A valuable lesson learned from this deployment is that units should focus early on power management issues and train accordingly so that they are prepared when deployed.

By the end of April, the temperature at Kandahar was nearing degrees Fahrenheit. During our missions in Afghanistan, we had two aviators assigned to our performance-planning cell. We quickly learned that power management was a skill necessary to survive our deployment. This cell always contained at least one p;c the unit instructor pilots.

We had already conducted numerous missions to include Operation Anaconda. Each mission required performance planning for altitudes, temperatures, and gross weights that were much higher than we normally operate. During the deployment, we were exposed to a wide range of temperatures, a variety of flight environments, and altitude extremes that we had never operated in before.

The terrain is relatively flat with rolling sand dunes 10 miles west and a mountain range approximately 15 miles to the north. The racetrack patterns and running fire tactics we utilized were necessary due to insufficient power to hover and to increase our own survivability.

  ESCLEROSIS SISTEMICA PROGRESIVA PDF

AHD Block 2 PPC Book – Study Material

We arrived in Afghanistan near the end of January and were based out of Kandahar International Airport. Kandahar is approximately 3, feet mean sea level MSL and can be characterized as high desert.

I slowly increased the power until I drooped the rotor and then decreased the collective. We knew that it would not be long before power was a luxury that we would not have. Performance planning was a critical part of opc mission. We adapted to this environment well, but were fortunate to have a wealth of experienced aviators in our company.